Research Group in Sustainable ConstructionMPeC · Ongoing
PREWALL
Modular Wall System for Sustainable Construction
Period01.12.2025–30.11.2028
FundingFEDER · NORTE 2030
Funding scopeNational
GICoS coordinatorLuís Mesquita
Total budget€1,482,947.20
IPB budget€409,960.00
Project codeNORTE2030-FEDER-01466500 · Project 18356 · MPr-2023-8
PartnersCarpintaria Mofreita · Granorte · Bragança Polytechnic University
Project focus
Research translated into validated knowledge and practical outcomes.
Development of a lightweight, adaptable prefabricated wall system integrating timber framing, cork-based insulation, high-performance multilayer solutions and optimised connections for faster and more resource-efficient construction.
Objectives
- Develop an adaptable prefabricated light timber wall
- Integrate cork insulation and fire-protection products
- Optimise modular connections and service integration
- Model and validate mechanical, thermal, acoustic and fire performance
Expected and delivered outputs
- Validated functional requirements
- Cork-based insulation system
- Pre-series and industrial wall prototypes
- Performance classification and life-cycle assessment
GICoS team: Luís Mesquita · Paulo Piloto · Débora Ferreira · Jorge Vaz · Luísa Barreira · Matheus Alves